Categories
Advocacy

Transport coalition’s asks from Parliamentary Inquiry into E-mobility Safety and Use 

Bicycle Queensland has joined RACQ and Queensland Walks in calling for urgent reforms to improve safety as new data shows a sharp rise in e-mobility-related injuries across Queensland. 

New research from the Queensland Injury Surveillance Unit (QISU) shows more than 2,000 people presented to Queensland emergency departments with e-mobility injuries in 2025, a 23% increase on 2024 and a 45% increase on 2023. The data represents only around 25–30% of total emergency department presentations, meaning the true number of injuries is likely significantly higher. 

At a joint press conference RACQ Head of Public Policy Dr Michael Kane said the figures show the situation is worsening rapidly. 

“Queensland’s e-mobility crisis has reached tipping point, the upcoming report provides a clear-cut opportunity to change course,” Dr Kane said. 

“We welcome the Queensland Premier’s commitment to provide the strongest response in the nation, especially considering the rate of hospitalisations in Queensland. 

“At least 2,000 Queenslanders were admitted to hospital in 2025 due to e-mobility injuries, but as emphasised during the inquiry last year, these figures represent real individuals whose lives have been upended.” 

Bicycle Queensland, along with RACQ and Queensland Walks, is urging the Parliamentary Committee to recommend strong and immediate measures to improve safety. 

“The things we are asking for cover enforcement, retailers, education, hire schemes and of course infrastructure,” said BQ CEO Prof. Matthew Burke. “If we improved these five things we’d be in a much better situation than we are now.” 

Key reforms called for by Bicycle Queensland and partners 
  • Stronger enforcement to stop illegal devices and unsafe behaviour, resourcing for expanded enforcement powers, and penalties for illegal high-powered devices. 
  • Crackdown on unsafe retailers, restricting sales of e-mopeds and e-motorbikes to licensed dealers and tightening import standards. 
  • Improved data and education, including statewide reporting and public dashboards supported by education campaigns. 
  • Investment in safer infrastructure, including higher-quality footpaths and separated cycling and micromobility lanes. 
  • Revamped hire schemes to improve safety and reduce footpath clutter. 
Categories
Uncategorised

Pre-order your Her Ride jersey now!

Bicycle Queensland is excited to unveil the updated Her Ride jersey. It has been designed to celebrate the incredible women who make up the Her Ride community. Her Ride is about safety and skills, but also the social connections made when taking part in a Her Ride course. We believe the jerseys are a great way to show you have been part of the Her Ride program.

We love spotting previous Her Ride jerseys out on the roads, paths and trails across Queensland, and with so many new riders joining the program, it felt like the perfect time for a fresh design. The new design has been updated with an eye on visibility, while sticking with a vibrant design to stand out from previous iterations.

The new Her Ride jersey is now available for pre-order at a special launch price of $89 posted (usually $114 posted once stock lands in the BQ Shop).

Made by Bowy, the jersey features a second-skin, performance fit. It is a light weight material with a full length zip – ideal for riding in Queensland conditions. If you prefer a more relaxed fit, we recommend sizing up – but ensure you measure up based on the Bowy size guide (see below), not from previous jerseys you own.

Whether you’re rolling with your local group met at a Her Ride course, tackling a weekend adventure, or commuting on two wheels, we can’t wait to see more Her Ride jerseys out on the roads and trails this year.

Orders close Sunday March 1, 2026. Orders will be posted out approximately 6 weeks after orders close.

Categories
Advocacy Bikeway detours and closures

Temporary Herschel Street bikeway detour  

Bike riders travelling through Brisbane’s CBD will see a temporary detour on the Herschel Street crossing to Roma Street from Wednesday 11 February 2026, as part of ongoing works for the Cross River Rail project. 

The shared path between George Street and Roma Street will close for up to eight weeks to allow construction of an improved walking and riding environment. While the detour will require adjustments to your regular route, the outcome will deliver better safety and connectivity for riders. 

You have a few options during the closure, however the George Street bike lane provides a clear and safe alternative south of the closure, and the signalised crossing at Makerston Street will assist people walking or riding through the area. If you must use the Roma Street footpaths, please be considerate of pedestrians. There will be traffic control and signage in place to assist riders, pedestrians and motorists.  

Allow another minute or two on your trip, and take extra care on the detour you choose – including being mindful as pedestrians negotiate the same changes in their route. 

BQ has long advocated for safer, more intuitive and higher-quality cycling infrastructure through the Brisbane CBD, particularly on key east–west links like Herschel Street. Unfortunately, a safe riding thoroughfare along the full length of Herschel Street will not be developed within this particular project. 

Once construction is complete, a new shared link between George and Roma streets will open, with excellent connections to Roma Street station.  

BQ will continue to keep members informed as works progress and encourages riders to report any issues encountered during the detour so they can be raised with the project team. More details can be found on the project website.

Categories
Advocacy

Logan Faster Rail: Reinstate the Active Transport Corridor 

The Logan and Gold Coast Faster Rail project was meant to deliver a continuous Active Transport Corridor alongside the rail line — a safe cycling route connecting communities from Kuraby to Beenleigh. But two key sections of bikeway have now been removed from the project design, without public consultation. Bicycle Queensland is calling for the corridor to be reinstated in full — and we need your help. 

The issue 

Long, safe bikeways are rare in South East Queensland — which is why the Logan Faster Rail Active Transport Corridor mattered so much. This project was meant to deliver a continuous cycling corridor from Kuraby to Beenleigh, around three times longer than Ipswich Road in Brisbane, creating a safe, direct route that would serve: 

  • everyday riders commuting to stations 
  • local school students riding safely to and from school 
  • regional cycle tourism 

The Queensland Government, acting through the Department of Transport and Main Roads rail branch, has deleted two key sections of the bikeway: 

  • Between Woodridge and Kingston Stations 
  • From Compton Road to Kuraby Station 

The Queensland Government project team did not consult with or advise the public about this major change. 

BQ is not sure that the Commonwealth Government was properly advised of the change in project scope to delete the bikeways. The Commonwealth is paying half the bill for the overall works and may not be impressed. 

BQ’s solution 

Bicycle Queensland is calling for the full reinstatement of the Logan Faster Rail Active Transport Corridor, delivering the safe, continuous route that was originally promised. 

First priority: Woodridge to Kingston 

Our highest priority is reinstating the Woodridge to Kingston section. This would restore most of the continuous bikeway and directly support safe access for thousands of students. 

This section serves schools with a combined population of approximately 4,000 students, including: 

  • Kingston State School 
  • Groves Christian College 
  • Kingston State College 
  • The Y School 
  • Loganlea State High School (directly on the corridor south of Kingston Station) 
Updates 
  • BQ were first briefed approximately six weeks after first asking for information
  • There has still been no public consultation on the removal. 
  • The project is expected to soon move from design to construction — once construction starts, reinstating the corridor becomes significantly harder. 
  • BQ met with Minister Mickelberg on January 19 and were told he wasn’t going to reinstate these links.  
  • We have now written to all local and state Members of Parliament that surround the corridor. BQ has been advised that they are making inquiries and that discussions are underway.  
Action you can take 

If you want a safe cycling route from Brisbane to the Gold Coast — or you live near Woodridge, Kingston, Loganlea or Kuraby — please act now. 

1) Email the project team 

Let the Logan and Gold Coast Faster Rail project team know you want the Active Transport Corridor reinstated: 

logangoldcoastrail@tmr.qld.gov.au 

2) Contact your local State MP 

Ask your State MP to raise the issue directly and support reinstatement of the corridor: 

  • Melissa McMahon MP (Macalister) — macalister@parliament.qld.gov.au 
  • James Martin MP (Stretton) — stretton@parliament.qld.gov.au 
  • Hon Cameron Dick MP (Woodridge) — woodridge@parliament.qld.gov.au 
  • Hon Shannon Fentiman MP (Waterford) — waterford@parliament.qld.gov.au 

3) Contact your local Federal MP 

The Commonwealth is also part-funding this project. Ask your Federal MP to push for reinstatement of the corridor: 

  • Hon Julie-Ann Campbell MP (Moreton) — Julie-Ann.Campbell.MP@aph.gov.au 
  • Hon Rowan Holzberger MP (Forde) — Rowan.Holzberger.MP@aph.gov.au 
  • Hon Jim Chalmers MP (Rankin) — jim.chalmers.mp@aph.gov.au 

4) Mobilise school communities 

If you have children or grandchildren at: 

  • Kingston State School 
  • Groves Christian College 
  • Kingston State College 
  • Loganlea State High School 
  • Y School 

Contact the school’s P&C Association and ask them to advocate strongly for the bikeway to be reinstated. 

5) Join either the Logan Bicycle User Group (Logan BUG) or Bicycle Queensland 

The Logan BUG are local cyclists who work hard to make cycling conditions better in the area. Bicycle Queensland is the peak advocacy group for cycling in Queensland. Your membership helps support the advocacy work of Bicycle Queensland, including on campaigns like this.  

Categories
Advocacy

Brisbane Riverwalk reopens at Eagle Street after major upgrade 

Bicycle Queensland welcomes the reopening of a key section of the Riverwalk at the  Waterfront Brisbane project, after more than two years of construction works. 

The upgraded Riverwalk section will reopen by midday on Tuesday 3 February, after being closed for approximately 30 months to enable construction works by Dexus. 

This section of the Riverwalk had long been a challenging pinch point for people walking and riding, with narrow widths, poor sight lines and tight corners creating conflict and safety concerns for all users. 

BQ was invited by Dexus to preview the new Riverwalk section ahead of its reopening. 

The shared path now features a generous 6m-wide corridor with smooth concrete surfacing, improved sight lines and safer corners. Shallow cobblestones have also been used to visually indicate areas where users can expect higher foot traffic, supporting safer behaviour and awareness along the shared route. 

Riverwalk will also connect directly to end-of-trip facilities for the Waterfront Brisbane currently under construction, supporting more people to choose walking and riding as part of their commute when the towers open. 

BQ CEO Matt Burke praised the upgrade and the project’s delivery timeline. 

“While construction has taken over two years, the Riverwalk is re-opening on time and it looks like the finished product is pretty darn good. Well done to the developers to creating and sticking to that vision.” 

Bicycle Queensland will continue advocating for high-quality, safe and connected active transport infrastructure across Brisbane and Queensland, ensuring that shared paths and commuter corridors work well for everyone.