Categories
Events

IRONMAN 70.3 Sunshine Coast

Our very own Amanda Hernandez, Membership Coordinator completed the IRONMAN 70.3 Sunshine Coast on 11 September 2022. A swim that started on the beautiful Mooloolaba Beach, followed by a fast and furious ride and a picture-perfect two-lap coastal run. What an amazing effort, below you can read Amanda’s recount of the day.

Last year I rode the bike leg of the IRONMAN Sunshine Coast 70.3, and I thought anyone who runs a half marathon after riding 90km had to be crazy. Then I thought, I wonder if I could do it? I had run a few half marathon distances on road and gravel. Next minute, it was on my goals list for 2022! I needed a swimmer and luckily I knew a good one who kindly stepped up. Learning how to swim is also on my goals list for this year!

I knew nothing about how to train. I didn’t understand the training plans, they were all about the length of time and effort. I normally work on distance, and go as fast or as slow as I feel like on the day. I asked a few people who had done Ironman events for advice and devised a plan. I started using gels and Gatorade, a change from post-ride hot chocolates and pastries. Most of my training was done solo, and with early winter starts, it was tough.

While I’m a confident rider, my main concern was not being able to fix a flat, and not making it to the run leg. I knew the steps involved, but my hands are not overly strong or dexterous, and I’ve always needed help to get a tyre off and on the rim. I didn’t know how to take the rear wheel off a bike – also on my goals list! A week before the event, I managed to take the rear wheel off and put it on. Once you understand the mechanics, there’s no turning back. Three nights before the event, for the first time, I installed new tubes and tyres, front and rear, all by myself with supervision and coaching from my bike handler.

Race day nerves weren’t present, because I was a little stressed about my delay in arriving at transition. I had to pump my tyres and unpack my gear bag before transition closed. Then, I lost my swimmer after dropping off the pump – so many wetsuits, everyone looked the same, and I didn’t have my glasses. Off to the beach I went to wait for the start and hoped to see her run into the water. Once I thought I saw her I went back to transition to prepare for the ride. The bike leg went well although I rationed my fluids too much. I hit the same small patch of glass and pothole on each lap, at least I was consistent! I couldn’t stomach a gel until I was 12km into the run leg, and that was the only one. The rest of the leg was done on water and Gatorade. I need to work on different nutrition for the next 70.3.

That’s right, the next one. There will be another 70.3 on my goals for next year. Challenge yourself and step outside of your comfort zone. You will learn and grow.

Categories
Education Partner News

White Cloud Foundation Partnership

Bicycle Queensland would like to announce an exciting new partnership with White Cloud Foundation. White Cloud is a charity organisation that provides free tele-mental health services to Queenslanders struggling with anxiety and depression. White Cloud also provide an incredible meals for mums service which support women at risk of or experiencing perinatal depression.

This partnership enables Bicycle Queensland members to access support without a diagnosis, no referral, and at no cost. White Cloud’s services include mental health nursing and counselling, psychology, social work, dietitians, and exercise physiology.

White Cloud was created to remove the barriers to accessing mental health treatment, identifying that getting access to early support when you have the speed wobbles is incredibly important.

BQ CEO Rebecca Randazzo said, “We know that some of the reasons why we ride a bike is for that social connection and wellbeing and we are really excited to partner with White Cloud and bring about great outcomes for our members”.

If you need support, you can access White Clouds service by calling 07 3155 3456

Find out more about White Cloud

Adam Scott Chair of WCF with BQ CEO Rebecca Randazzo
Categories
Advocacy Uncategorised

Bridges section of Boyne-Burnett Inland Rail Trail opens

Opening of the Mt Debatebale to Mundubbera rail trail.

The Boyne-Burnett Inland Rail Trail (BBIRT) is a great success story of grassroots actions by communities a long way away from the seat of power. Last weekend a second section was officially opened, 30km of trail from Mt Debateable to Mundubbera.

This is the “Bridges” section of the BBIRT, as the rail corridor runs beside the mighty Burnett River, and crosses the many creeks feeding the river as they run off Mt Gayndah and the Binjour Plateau. The bridges which cross these creeks are listed by Engineers Australia as being of heritage significance.

Unfortunately floods have seen off two of these bridges, Reid Creek and Philpott, making it difficult for the rail trail to run along the corridor the entire distance from Gayndah to Mundubbera. At present, the trail starts 10km out of town in Mt Debateable siding, as the Reid Creek crossing prevents the trail from connecting into Gayndah. However, there is a detour around the site, where the bridge across Philpott Creek once was, adding a few kilometres to the journey.

Like many Queensland rail trails, this is an adventure experience. There are sandy sections, bumpy sections, and a few steep pinches out of gullies. The trail is best suited to a mountain bike (e-mtb is becoming popular too).

But for the adventurous who attempt the Bridges section of the BBIRT, you are rewarded with great views, and several plaques marking historical sites of interest.

Packs and Pedals’ runs a shuttle service on the BBIRT, and they can help you explore either the Bridges section or the Tunnels section from Kalpowar to Ubobo in the Boyne Valley.

Categories
Bikeway detours and closures

Brisbane Riverfire Bikeway Closures

Brisbane City Council has advised there will be a number of shared path and bikeway closures from Thursday the 23rd to Saturday 25th of September as a result of the Riverfire event.

Closures include:

Story bridge Western footpath from 8am 23rd September to 8.30pm 25th September.

Goodwill bridge closed from 4-8pm Saturday.

Story bridge Eastern footpath 6.15-8pm Saturday.

New Farm Riverwalk 6.30-7.15pm Saturday.

Bikeways and shared paths around South Brisbane and Brisbane CBD may be impacted by large numbers of pedestrians during the Riverfire event. Please exercise caution when navigating through these affected areas.

Road Closure information may be found at https://www.brisbanefestival.com.au/sunsuper-riverfire-road-closures

Categories
Bikeway detours and closures

North Brisbane Bikeway Stage 4 Construction Works on Price Street

The Department of Transport and Main Roads has advised that the rescheduled works on the North Brisbane bikeway north of Price Street will commence from Monday the 6th of September 2021.

The works are expected to be completed within the week, with the night works to be completed between the hours of 7pm to 5am Sunday to Thursday.

There will be changed traffic conditions in the area including detours, signage and lane closures. When using the area exercise caution and follow all directions while navigating through the affected site.

To view the offical TMR notice click here

North Brisbane Bike Way Map of Works
North Brisbane Bikeway Construction works